Performance Improvement Plan (PIP)
Formal, written document that identifies specific performance deficiencies, states the measurable standard the employee must reach, describes the support the employer will provide, and sets a deadline with stated consequences for failure to improve.
What Is a Performance Improvement Plan?
A performance improvement plan is a formal, written document that identifies specific performance deficiencies, states the measurable standard the employee must reach, describes the support the employer will provide, and sets a deadline with stated consequences for failure to improve.
A PIP sits at the serious end of performance management — usually after informal coaching and often after a documented verbal or written warning. It is distinct from a development plan, which builds on adequate performance; a PIP addresses performance that is currently below the acceptable bar.
Is a PIP Remedial or Pre-Termination Paperwork?
This deserves an honest answer, because employees widely believe a PIP means the decision is already made — and they are often right. In many organizations the PIP functions primarily as documentation to support a termination and to demonstrate that the employer gave notice and an opportunity to correct.
Both uses can be legitimate, but they should not be confused:
- •A genuine remedial PIP is issued when the manager believes improvement is realistically achievable, provides real support, and would be pleased to see the employee succeed. Some employees do turn around, particularly where the root cause was unclear expectations, a bad role fit that can be adjusted, or a fixable skill gap.
- •A pre-termination PIP is issued when the manager has effectively concluded the employee will not succeed. If that is the situation, consider whether a direct, respectful separation with severance is the more honest course. Running a 90-day process you expect to fail costs the employee months of stress and job-search delay, and it costs you productivity and team morale.
Decide which one you are issuing before you write it, and be consistent — an organization where PIPs are always terminal loses the ability to use them remedially at all.
Required Elements
- •Specific deficiencies: Not "poor attitude" or "lacks ownership." Name the behavior, the date, and the impact — missed three of five sprint commitments in Q2, error rate of 8 percent against a 2 percent standard.
- •Measurable expectations: State the standard in terms both parties can verify. Ambiguous targets make the plan unenforceable and unfair.
- •Support and resources: Training, shadowing, a mentor, revised workload, clearer documentation, weekly manager time. A PIP with no employer obligations reads as a pretext.
- •Timeline and check-in cadence: Typically 30, 60, or 90 days, with scheduled written check-ins — weekly is common. Match the duration to how long the work actually takes to demonstrate; a quarterly sales cycle cannot be assessed in 30 days.
- •Consequences: State plainly what happens if the standard is not met, including possible termination. Preserve at-will status explicitly and avoid language promising employment through the end of the plan.
- •Signatures: The employee signs to acknowledge receipt, not agreement. Note a refusal to sign rather than fighting about it.
Legal Risk Points
- •ADA: If the employee discloses a disability or medical condition during the PIP, the interactive process is triggered. You must consider reasonable accommodation going forward; you generally need not excuse past performance failures, but you cannot ignore the request and continue to the termination on schedule.
- •FMLA: A PIP timeline should be paused, not run, during FMLA leave, and the employee cannot be penalized for protected absences. Attendance-based deficiencies must exclude FMLA, ADA, USERRA, and protected sick leave time.
- •Retaliation: A PIP issued shortly after a harassment complaint, a wage claim, an OSHA report, or a leave request creates strong temporal-proximity evidence. If the performance concerns predate the protected activity, make sure that record exists in writing beforehand — and have HR or counsel review the timing.
- •Consistency: If similarly performing employees outside the protected class were coached informally while this employee got a PIP, that comparator evidence is damaging.
Common Pitfalls
- •Writing the PIP as a compliance formality and providing no actual coaching during it.
- •Vague standards that let the manager declare failure regardless of what the employee does.
- •Skipping the scheduled check-ins, then terminating at day 90 with no interim feedback.
- •Setting a bar materially higher than what peers are held to.
- •Failing to close the loop in writing — a successful PIP should end with a documented completion notice.